The Building Committee was formed in 1989 chaired by Richard McGrail, a parishioner.

The architectural firm of Degenshein, Denker and Bodnar of Nyack was selected to design the church with Mr. Attila Bodnar, the architect.

The Building Committee selected the Moran Company, a professional fundraising firm to coordinate the Building Fund Campaign.

More than 800 families pledge $1.6 million over a 3-year period.